Default North London Line AC/DC question


Why do the trains on the NLL switch over to 25Kv AC at Hackney Wick
and then switch back to DC at Dalston when the 3rd rail is continuous
along that section anyway? Why not just stay on DC and save the wear
and tear on the pantograph?

B2003

  #2   Report Post  
Old January 17th 08, 02:55 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default North London Line AC/DC question

Boltar wrote:
Why do the trains on the NLL switch over to 25Kv AC at Hackney Wick
and then switch back to DC at Dalston when the 3rd rail is continuous
along that section anyway? Why not just stay on DC and save the wear
and tear on the pantograph?


Mainly because the Class 313s work better on AC than on DC. They were
originally designed as an AC unit with the DC only for the short
section from Drayton Park - Moorgate and reliability suffered when
they first transferred to the North London Line. Of course, from next
year when the new platforms open at Stratford, they will run on AC all
the way from Stratford to Dalston.
  #3   Report Post  
Old January 17th 08, 03:31 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 559
Default North London Line AC/DC question


"Andy" wrote in message
...
Boltar wrote:
Why do the trains on the NLL switch over to 25Kv AC at Hackney Wick
and then switch back to DC at Dalston when the 3rd rail is continuous
along that section anyway? Why not just stay on DC and save the wear
and tear on the pantograph?


Mainly because the Class 313s work better on AC than on DC. They were
originally designed as an AC unit with the DC only for the short
section from Drayton Park - Moorgate and reliability suffered when
they first transferred to the North London Line. Of course, from next
year when the new platforms open at Stratford, they will run on AC all
the way from Stratford to Dalston.


and when ELLX gets to Highbury & Islington the NLL tracks will be AC between
Dalston and Camden Road, and the new NLL trains will run on AC all the way
from Stratford to Acton.

Peter


  #4   Report Post  
Old January 17th 08, 03:39 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default North London Line AC/DC question

On 17 Jan, 16:31, "Peter Masson" wrote:
"Andy" wrote in message

...

Boltar wrote:
Why do the trains on the NLL switch over to 25Kv AC at Hackney Wick
and then switch back to DC at Dalston when the 3rd rail is continuous
along that section anyway? Why not just stay on DC and save the wear
and tear on the pantograph?


Mainly because the Class 313s work better on AC than on DC. They were
originally designed as an AC unit with the DC only for the short
section from Drayton Park - Moorgate and reliability suffered when
they first transferred to the North London Line. Of course, from next
year when the new platforms open at Stratford, they will run on AC all
the way from Stratford to Dalston.


and when ELLX gets to Highbury & Islington the NLL tracks will be AC between
Dalston and Camden Road, and the new NLL trains will run on AC all the way
from Stratford to Acton.


Will the 3rd rail be lifted then?

B2003

  #5   Report Post  
Old January 17th 08, 03:44 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 559
Default North London Line AC/DC question


"Boltar" wrote

and when ELLX gets to Highbury & Islington the NLL tracks will be AC

between
Dalston and Camden Road, and the new NLL trains will run on AC all the

way
from Stratford to Acton.


Will the 3rd rail be lifted then?

The whole lot will probably have to be relaid anyway, to provide 4 platforms
at Canonbury and Highbury, and 4 tracks on the current 3-track section. I
can't see the juice rail surviving all that (except on the ELLX lines
between Dalston Junction and Highbury & Islington, as the ELLX will be an
entirely DC operation, and its trains, though in other respects essentially
the same as the new trains for the NLL, will be DC only).

Peter




  #6   Report Post  
Old January 17th 08, 04:15 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default North London Line AC/DC question

On 17 Jan, 16:44, "Peter Masson" wrote:
"Boltar" wrote

and when ELLX gets to Highbury & Islington the NLL tracks will be AC

between
Dalston and Camden Road, and the new NLL trains will run on AC all the

way
from Stratford to Acton.


Will the 3rd rail be lifted then?


The whole lot will probably have to be relaid anyway, to provide 4 platforms
at Canonbury and Highbury, and 4 tracks on the current 3-track section. I
can't see the juice rail surviving all that (except on the ELLX lines
between Dalston Junction and Highbury & Islington, as the ELLX will be an
entirely DC operation, and its trains, though in other respects essentially
the same as the new trains for the NLL, will be DC only).

Peter


Obviously under the arrangement for the ELLX up to Highbury &
Islington that has become apparent lately there's no need for the ELLX
rolling stock to have AC equipment, but I was under the impression
that all the new class 378 Electrostar trains for London Overground
were all ordered as dual system (i.e. AC & DC) stock - am I wrong in
thinking this, or has the order subsequently been amended?
  #7   Report Post  
Old January 17th 08, 04:27 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 559
Default North London Line AC/DC question


"Mizter T" wrote

Obviously under the arrangement for the ELLX up to Highbury &
Islington that has become apparent lately there's no need for the ELLX
rolling stock to have AC equipment, but I was under the impression
that all the new class 378 Electrostar trains for London Overground
were all ordered as dual system (i.e. AC & DC) stock - am I wrong in
thinking this, or has the order subsequently been amended?


November 2007 MR stated 'TfL has ordered 20x4-car Electrostars for the ELL
(plus 108 vehicles for the NLL and Euston - Watford DC). The ELL units will
be DC trains, although they will have provision for AC to be provided at a
later date if necessary".

Peter


  #8   Report Post  
Old January 17th 08, 04:31 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2006
Posts: 498
Default North London Line AC/DC question

On Jan 17, 5:15*pm, Mizter T wrote:
On 17 Jan, 16:44, "Peter Masson" wrote:



"Boltar" wrote


and when ELLX gets to Highbury & Islington the NLL tracks will be AC

between
Dalston and Camden Road, and the new NLL trains will *run on AC all the

way
from Stratford to Acton.


Will the 3rd rail be lifted then?


The whole lot will probably have to be relaid anyway, to provide 4 platforms
at Canonbury and Highbury, and 4 tracks on the current 3-track section. I
can't see the juice rail surviving all that (except on the ELLX lines
between Dalston Junction and Highbury & Islington, as the ELLX will be an
entirely DC operation, and its trains, though in other respects essentially
the same as the new trains for the NLL, will be DC only).


Peter


Obviously under the arrangement for the ELLX up to Highbury &
Islington that has become apparent lately there's no need for the ELLX
rolling stock to have AC equipment, but I was under the impression
that all the new class 378 Electrostar trains for London Overground
were all ordered as dual system (i.e. AC & DC) stock - am I wrong in
thinking this, or has the order subsequently been amended?


The class 378 units will be split into two. The replacements for the
class 313 will be dual voltage. The 'extras' for the ELLX will be DC
only, at least initially, but will have passive provision for AC as
well. I wouldn't be surprised if all the units end up as dual voltage,
especially as the services for Phase 2 of the ELLX might change
depending on loadings after phase 1 is completed.
  #9   Report Post  
Old January 17th 08, 04:42 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default North London Line AC/DC question

On 17 Jan, 17:15, Mizter T wrote:
Obviously under the arrangement for the ELLX up to Highbury &
Islington that has become apparent lately there's no need for the ELLX
rolling stock to have AC equipment, but I was under the impression
that all the new class 378 Electrostar trains for London Overground
were all ordered as dual system (i.e. AC & DC) stock - am I wrong in
thinking this, or has the order subsequently been amended?


You're wrong, I think: TfL's original press release mentions that the
NLL ones would be dual-voltage (and hence implies that the ELL ones
wouldn't be):
http://www.tfl.gov.uk/corporate/medi...ntre/3534.aspx

Of course, the ELL ones will have pantograph spaces and will be
electronically capable of AC/DC operation, like all new 3rd rail
stock.

--
John Band
john at johnband dot org
www.johnband.org
  #10   Report Post  
Old January 17th 08, 06:07 PM posted to uk.transport.london, uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default North London Line AC/DC question

On Jan 17, 9:42 am, John B wrote:


Of course, the ELL ones will have pantograph spaces and will be
electronically capable of AC/DC operation, like all new 3rd rail
stock.



Indeed, this is a key point for all present generation EMU.

Although in the general case of all types (i.e. beyond the 378s being
discussed above) it might be more than just a pantograph tp be added -
some existing classes would need - or might need in future if ordered
without - a transformer to be needed as well.

But yes power electronics are already capable.

--
Nick


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
North London Line update Adrian Auer-Hudson, MIMIS London Transport 52 July 5th 06 09:04 PM
North London Line update Paul G London Transport 15 June 17th 06 12:39 AM
North Greenwich car park question Peter Cooper London Transport 1 January 4th 06 07:45 AM
Improvements to the North London Line [email protected] London Transport 39 June 22nd 05 09:37 PM
North London Lines question Nestor Badudoy London Transport 9 September 11th 04 11:54 AM


All times are GMT. The time now is 10:29 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017