London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old February 23rd 10, 01:19 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default DLR 3 car trains

On Tue, 23 Feb 2010 13:36:09 +0000 (UTC)
Martin Petrov wrote:
http://www.docklands24.co.uk/content...ws/story.aspx?
brand=Docklands&category=news&tBrand=docklands&tC ategory=znews&itemid=WeED23%
20Feb%202010%2010%3A53%3A19%3A520

It's the front page story on the physical edition.

I too will be loitering at Canary Wharf longer than I need to tonight in
the hope of spotting one.


One wonders why they didn't go to three car immediately from one car operation
(or at least set up the infrastructure for 3 car) back in the 90s and save
themselves a lot of hassle and money in the long run.

B2003

  #2   Report Post  
Old February 23rd 10, 03:04 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 2,008
Default DLR 3 car trains

wrote in message

On Tue, 23 Feb 2010 13:36:09 +0000 (UTC)
Martin Petrov wrote:
http://www.docklands24.co.uk/content...ws/story.aspx?
brand=Docklands&category=news&tBrand=docklands&tCa tegory=znews&itemid=WeED23%
20Feb%202010%2010%3A53%3A19%3A520

It's the front page story on the physical edition.

I too will be loitering at Canary Wharf longer than I need to
tonight in the hope of spotting one.


One wonders why they didn't go to three car immediately from one car
operation (or at least set up the infrastructure for 3 car) back in
the 90s and save themselves a lot of hassle and money in the long run.


Might I refer you to the similar discussion two months ago?

And, BTW, pretty much all of the newer infrastructure was constructed
with three-car trains in mind. It's only the remaining sections of the
original infrastructure that have needed more work. In some cases, it
was possibly to extend stations to two-car length, but not three-car, so
more work has been needed this time (eg, moving South Quay station,
which wouldn't have been justified when the original train extension
happened).


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
3 Car DLR.... Martin Petrov[_2_] London Transport 7 February 14th 10 04:09 PM
London Overground Euston - Watford: 6 car trains? Dominic London Transport 2 May 19th 09 12:03 PM
A Car Is Ready For You - Used Car Auto Loans virig London Transport 0 November 20th 07 10:18 AM
How does new car on Jubilee trains affect performance? Boltar London Transport 12 March 5th 06 12:22 PM
DLR three car trains - City Airport extension Londoncityslicker London Transport 6 August 28th 05 11:54 AM


All times are GMT. The time now is 03:16 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017