London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old June 4th 10, 09:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Wires or pantograph down on NLL, 2 June 2010

In article %aeOn.33767$jh6.21404@hurricane,
(Richard J.) wrote:

It's not going well on LO this week. We have another "overhead
line problem" at Camden Road tonight.


Not just the NLL. The GN had a power supply problem at Potters Bar. We
came home on the 15:45 to Lynn via the Hertford Loop. 40 minutes late at
Cambridge.

Nothing at all on their or the National Rail web sites now.

--
Colin Rosenstiel


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
More fun with wires over the road Basil Jet[_4_] London Transport 6 November 30th 15 12:43 PM
City Thameslink overhead wires martin j London Transport 12 October 3rd 09 09:48 PM
No drivers on busiest line after 2010 Richard J. London Transport 8 December 27th 04 08:36 PM
East London Line may be shelved until at least 2010 K London Transport 0 April 1st 04 10:40 AM
Copper Wires David Baxter London Transport 3 September 16th 03 01:14 PM


All times are GMT. The time now is 12:16 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017