London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #22   Report Post  
Old August 22nd 11, 09:34 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2006
Posts: 1,147
Default Stadler's won the tender to provide six new trams for Croydonarea

On 22/08/2011 20:03, Richard wrote:
On Sun, 21 Aug 2011 09:22:41 +0100, Arthur Figgis
wrote:

AIUI the problem was that the 726 timings were horribly unreliable by
the time it reached Sutton, never mind Kingston, and it only ran hourly.
This made it a bit dodgy to use for getting to to the airport and only
much use for other trips if you had a lot of time on your hands. It also
stopped everywhere, so people going one stop slowed it down even more.
[...]
It did improve west of Croydon - doubled in frequency, chopped some stops.


From my westerly location I got the feeling that reliability improved
dramatically when it went to Metrobus... am I being unfair? Perhaps
it was cut back to Croydon on the same date.

The doubling in frequency of the X26 was, as you'll know, more recent
and a Boris-inspired trial of orbital express routes. I recall a
report saying that it hadn't really proved the point but they'd keep
the new frequency (to avoid the embarrassment of cutting it so soon?).
Still, at the new frequency it seems very well-used. Ken's point
elsewhere is a good one I think - it would have been a perfect route
for early Countdown 1.0 installation.


IIRC the report said something to the effect that had they known what
the passenger numbers would be then they wouldn't have bothered
increasing it, but now they have bothered they wouldn't cut it back.

A pity that (your?) N213 had to suffer at around the same time.

Let's see what Quality Line make of the X26, new Citaros on the way I
think.


I noticed a pair of very shiny looking "not in service" buses the other
day, and wondered if they were new vehicles on test or something. But I
know nothing about buses, other than where to find the seats on the
little 410 buses where I can sit facing forward.

On the point of tram conversions without through fares, having through
fares between any bus routes on Oyster would, I think, address many
people's complaints in what is clearly one of the best bus networks in
the world. I'm not joking! But would people support the increase in
fares that would be necessary?


Bus transfer tickets would be nice, but I can't see it happening because
of the revenue implications.

--
Arthur Figgis Surrey, UK
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
My company provide most popular of the shoes model, bag, clothes,Bikini swimwear, sunglasses and watch of etc.. [email protected] London Transport 1 October 5th 23 02:18 PM
New Croydon trams. [email protected] London Transport 5 November 18th 15 09:14 PM
Thieves stole SIX MILES of copper wiring worth £700,000 CJB London Transport 4 February 1st 13 05:45 PM
Another six months of closures on Jubilee line to finish botched upgrade - Evening Standard Bruce[_2_] London Transport 15 November 25th 09 09:37 PM
Re-instating Lines to Relieve Congestion and Provide Capacity 1506 London Transport 0 October 30th 08 08:41 PM


All times are GMT. The time now is 02:00 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017