London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old October 20th 04, 11:02 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2004
Posts: 3
Default A406 upgrades

The Transport for London business plan for 2005 - 2012 includes "Schemes to
relieve traffic congestion and improve the local environment at Coulsden,
Bounds Green and Thames Road, Bexley"

I think this may be the minor improvemets planned and not the D3 grade
separated route.

There are details of the minor improvements at
http://www.londontransport.co.uk/str...20Bounds%20Gre
en.pdf








 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rail upgrades delayed Chris J Dixon London Transport 1 July 22nd 15 08:08 AM
Rail upgrades delayed [email protected] London Transport 2 June 25th 15 09:57 PM
A406 New Southgate to Green Lanes John Rowland London Transport 20 July 2nd 11 05:41 PM
Crossrail and Tube upgrades spared the axe - NCE Bruce[_2_] London Transport 62 October 8th 10 05:29 PM
Tube Upgrades upinthesky London Transport 2 July 20th 10 07:22 PM


All times are GMT. The time now is 02:59 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017