London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old February 9th 05, 05:54 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 221
Default Croxley Link Progress?

"Peter Lawrence" wrote in message
...
LU have announced that Herts CC have made a 'final' submission to the
DfT for funding for this project. The total cost is £65M (or ws last
year) and TfL is contributing £18M of this.


Is there a map showing the route of the link between the LU branch to
Watford LU and the disused Railtrack branch to Croxley Green? I presume that
Watford LU will be taken out of use, in the same way that Charing Cross
(Jubilee) is now redundant after the extension to Westminster and beyond.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Croxley Link progress Dave Arquati London Transport 10 May 23rd 04 12:43 PM
Croxley Link progress Stephen Furley London Transport 8 May 18th 04 11:34 PM
Croxley Link progress Solar Penguin London Transport 4 May 15th 04 07:38 PM
Croxley Link progress Dave Arquati London Transport 7 May 15th 04 12:56 PM
Croxley Link progress Boltar London Transport 1 May 14th 04 02:41 PM


All times are GMT. The time now is 02:36 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017