Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
East London Line Extension
Is it the intention that eventually there will no longer be LU
involvement with this line and instead Network Rail will take over infrastructure responsibility for both the existing and the extended bits with an "overground" train operator running the services? Will there only be a link to one or other of New Cross/New Cross Gate? Will the depot at New Cross be shut and the stock transfer connection between the ELL and District Lines be removed? Will the existing station at Shoreditch still be served? -- gordon |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
East London Line extension construction at Silwood | London Transport | |||
East London Line Extension | London Transport | |||
East London Line extension news | London Transport | |||
East London Line Extension (Who's gonna control it?) | London Transport |