Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#13
![]() |
|||
|
|||
![]()
In article , Mike Bristow
writes I've seen southbound train terminate at East Fincley often[1], but I've never seen a southbound train terminate at Finchley Central. I have, but only either in platform 1 or to then go into the siding. A failure of equipment which makes the train unsutable for passenger use between West Finchley and Finchley Central? At that point it's probably better to run empty to the depot than run into the nearest siding and try and fix it there. See previous post. [1] I go from Finchley to Archway, and as almost all southbound trains at Finchley go at least that far, I usually ignore the platform indicator. This means I get on the fisrt southbound train, and occasionally change at East Finchley. I've done this perhaps five or six times in the last year. There's a scheduled one somewhere in the early evening; about 6pm, I think. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Getting from Finchley to Bank with no Northern Line | London Transport | |||
Normal Northern Line service not resuming this week + pictures | London Transport | |||
Northern Line | London Transport | |||
Northern Line - again! | London Transport | |||
Northern line emergency engineering | London Transport |