Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#13
![]() |
|||
|
|||
![]()
Paul Terry wrote:
Surely the link was *designed* for regular use - it just never got used in regular service because of the abandonment of the Northern Heights scheme? IIRC only one of the two ramps between Drayton Park to Finsbury Park High Level was completed, with a fairly steepish incline of 1:50 - the other would have been 1:45. AIUI the Northern Heights tracks would have both continued parallel along the east side of Finsbury Park station on a new viaduct (which was partially built, since demolished). I don't think it involved a direct connection to the ECML, though I'm by no means an expert on the subject. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
A few observations | London Transport | |||
DLR Latest Observations | London Transport | |||
Some Questions - can anyone help me here, please? | London Transport | |||
River Transport Services - a couple of observations | London Transport | |||
I've been to London for business meetings and told myself that I'd be back to see London for myself. (rather than flying one day and out the next) I've used the tube briefly and my questions a | London Transport |