London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10   Report Post  
Old June 2nd 08, 07:54 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Mitcham Eastfields Open

In message
, at
11:58:08 on Mon, 2 Jun 2008, Mizter T remarked:
Can anyone say exactly how long this station took to be built - i.e.
from the start the proper construction phase? It's certainly been
fairly rapid - well under a year.


It would be interesting to know. East Midlands Parkeway, which is
supposed to be open in December, is currently just a load of mud. It may
have some foundations, or it may not, it's difficult to see, through the
mud.
--
Roland Perry


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tramlink doubling - Mitcham to Mitcham Junction Dr. Sunil London Transport 18 May 21st 12 12:20 PM
Mitcham Eastfields Mizter T London Transport 0 June 1st 08 01:53 PM
Mitcham Eastfields Batman55 London Transport 17 May 22nd 08 07:40 AM
Eastfields Station ? Batman55 London Transport 5 April 21st 08 08:50 PM
Eastfields Level Crossing Standing at HN28 signal London Transport 17 October 8th 07 09:52 PM


All times are GMT. The time now is 12:28 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017