London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old February 11th 09, 07:03 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Monday start for full WCML timetable

[original thread at uk.railway]
[x-posted to uk.transport.london]

On 11 Feb, 18:34, "Paul Scott" wrote:
Announced today by Network Rail:

"From Monday February 16th a further 16 daily Virgin services will be added
to almost 100 services that were introduced in December. London Midland will
introduce an extra six services to add to their 52 extra services added in
December. Southern will see the extension to Milton Keynes of its 32 trains
between Watford and south and west London..."

http://www.networkrailmediacentre.co...ReleaseID=4171


A rather parochial comment on my part regarding the extended Southern
services to MKC (though relevant to utl readers), but Southern reckon
they'll be a great success to which I can only agree:
http://www.southernrailway.com/news.php?id=222

---quote---
Southern’s hourly service will provide direct trains for people
travelling between towns along the West Coast Main Line and locations
in west and south London, including Wembley, Shepherd’s Bush and
Kensington Olympia. With connections to many other destinations at
Clapham Junction and East Croydon these trains will prove very
popular.
---/quote---

No direct service to Gatwick or Brighton any more of course but the
interchange at East Croydon for trains to these places is relatively
painless, with ramps and waiting rooms (with, FWIW, some buffet
facilities).

What's the long term future of these trains off the WCML & WLL with
regards to going to all the way East Croydon? I forget the detailed
machinations discussed in the South London RUS but I'm sure I recall
reading about the possibility that they might terminate at Clapham Jn
in the future (platform 17 in particular is currently no good for
hoards of interchanging passengers).


So presumably the 'weather problems' *which led to the 2/3 BHM & MAN WC
timetable running until yesterday have been solved, and LM have sorted all
their traincrew diagramming out...

Paul


Such cynicism! What could possibly go wrong...
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
WCML classic service after HS2 77002 London Transport 42 October 1st 11 10:23 AM
WCML OHLE ... E27002 London Transport 3 May 25th 10 09:17 PM
Full Service Moving Los Angeles California Movers linkswanted London Transport 0 January 22nd 08 01:13 AM
My Epping and Ongar railway History website will be have a reopening next wednesday FULL HISTORY"! EorJames London Transport 6 August 15th 05 07:51 PM
Full size Tube map For sale. EorJames London Transport 20 April 11th 05 10:35 PM


All times are GMT. The time now is 04:26 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017