London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #21   Report Post  
Old March 25th 09, 09:41 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,796
Default Extra Watford Junction - Euston services from May

On Wed, 25 Mar 2009 15:30:43 -0700 (PDT),
wrote:

Plus realign the track from the St Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!


Why was it moved?

Neil

--
Neil Williams
Put my first name before the at to reply.

  #22   Report Post  
Old March 25th 09, 10:52 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2006
Posts: 100
Default Extra Watford Junction - Euston services from May

On Mar 25, 10:41*pm, (Neil Williams)
wrote:
On Wed, 25 Mar 2009 15:30:43 -0700 (PDT),
wrote:

Plus realign the track from the St Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!


Why was it moved?


So they could extend the car park across the trackbed, if you look at
Google Maps satellite view, you can see the route of the original
alignment, which went down the back of the Homebase carpark (the curve
of the wall was the original alignment). You can clearly see the
station car park has two parts, the original bit between Platforms 9
and 10 and the extension between 10 and the newer platform 11, with a
short connection between them around the end of platform 10.

Part of the council's road plans would involve fiddling with the car-
park access, which might make reinstating the original alignment
easier, although this isn't mentioned in the plans (large pdf: http://
www.watford.gov.uk/ccm/cms-service/download/asset/?asset_id=14946050


  #23   Report Post  
Old March 26th 09, 08:38 AM posted to uk.railway,uk.transport.london
No Name
 
Posts: n/a
Default Extra Watford Junction - Euston services from May

In article
,
wrote:
Plus realign the track from the St Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!

While spending more than they would save on making the car park accessible
over the reinstated tracks. It is a very busy car park and losing it would
damage the attractiveness of Watford unction for many users.

--
David Wild using RISC OS on broadband
www.davidhwild.me.uk
  #24   Report Post  
Old March 26th 09, 09:24 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2006
Posts: 100
Default Extra Watford Junction - Euston services from May

On 26 Mar, 09:38, wrote:
In article
,
* wrote: Plus realign the track from the St Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!


While spending more than they would save on making the car park accessible
over the reinstated tracks. It is a very busy car park and losing it would
damage the attractiveness of Watford unction for many users.


The extra part of the car park would then be accessible from the
Imperial way side, around the end of the remaining sidings in the yard
(only a short stretch of new road would be needed). Access this way is
planned in the Hertfordshire Council improvement scheme anyway and
would involve a new road with a bridge over the line, linking St.
Albans Road to Imperial Way, with access from this road into the car
park.

  #25   Report Post  
Old March 26th 09, 10:41 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 48
Default Extra Watford Junction - Euston services from May

I thought about this for a bit, and came up with:

http://maps.google.co.uk/maps/ms?ie=...06545&t=h&z=18

...though I seem to have forgotten to add a turnback siding beyond my
new terminal platforms. The general idea is clear though. Conceivably
you could do the same to the fast line platforms to provide loops, but
given Virgin don't want to stop there at all even if stops didn't
reduce capacity, it's probably pointless.


  #26   Report Post  
Old March 26th 09, 08:58 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 139
Default Extra Watford Junction - Euston services from May


wrote in message
...
On 26 Mar, 09:38, wrote:
In article
,
wrote: Plus realign the track from the St
Albans Abbey line back into
platform 10 at Watford Junction and save plenty of money on having to
re-signal from the main line into the existing platform 11, and while
they are at it, they can put the track back in next to platform 10!


While spending more than they would save on making the car park accessible
over the reinstated tracks. It is a very busy car park and losing it would
damage the attractiveness of Watford unction for many users.


The extra part of the car park would then be accessible from the
Imperial way side, around the end of the remaining sidings in the yard
(only a short stretch of new road would be needed). Access this way is
planned in the Hertfordshire Council improvement scheme anyway and
would involve a new road with a bridge over the line, linking St.
Albans Road to Imperial Way, with access from this road into the car
park.

It sure is a pain having to negotiate the congestion around the station to
get to the car park. Even a car park on the Imperial Rd side and a foot
bridge would help.

Kevin




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
More trains on Sundays on Watford Junction - London Euston (LondonOverground) services burkey[_3_] London Transport 0 May 15th 11 01:43 PM
Fwd: Planets Gather on May 5 and May 17, 2000 [email protected] London Transport 4 February 8th 09 01:39 PM
Euston - Watford Junction Sam[_2_] London Transport 13 March 7th 08 06:45 PM
Watford Junction to London Euston [email protected] London Transport 16 February 23rd 08 04:54 PM
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 burkey London Transport 0 February 24th 07 12:35 AM


All times are GMT. The time now is 04:18 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017