Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Mon, 05 Oct 2009 12:45:52 +0100
David Cantrell wrote: On Fri, Oct 02, 2009 at 10:49:49AM +0000, wrote: I thought the service was only 2 trains? Oh well, I haven't been on the line for about 10 years. But even so , having the tunnels bi directional would mean that if a train died or points failed you could still run some semblence of a service. I would have thought that running such a reduced service would lead to terrible over-crowding so it would be shut down to stop the crowd from pushing people off the platforms. As opposed to it happening on the northern line instead? B2003 |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Two Stockwell oddities | London Transport | |||
F&*&%^& toilets | London Transport | |||
More Oystercard Oddities & TravelSafe officers | London Transport | |||
Northern Line Timetable 48 | London Transport | |||
Query on new SWR timetable | London Transport |