London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #24   Report Post  
Old March 30th 15, 11:02 AM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2014
Posts: 1,385
Default Updated London Crossrail 2 route protected

On 2015\03\30 10:59, Graeme Wall wrote:
On 30/03/2015 10:55, d wrote:
On Fri, 27 Mar 2015 17:10:52 +0000
Graeme Wall wrote:
On 27/03/2015 13:04,
d wrote:
On Fri, 27 Mar 2015 10:34:37 +0000
Graeme Wall wrote:
Your small houses appear to be 2 blocks of 8 flats each and you still
end up the wrong side of the M1. Can't really see the great advantage
of extending to Copthall.

Not sure where you're looking but they're definately houses.



https://goo.gl/maps/PaOGs The block in the background is right on the
extended line from Mill Hill East.


Just because they're square doesn't mean they're flats. They're
houses. Though
looks like there are 4 in the way, not 2. Even so, still irrelevant in
the
scheme of things. Maybe a million or 2 to buy out compared to the cost
of the
extension which would probably run to 7 or 8 digits.


Still don't see what you would achieve by extending unless you could get
across the M1 to the main line.


This argument is cracking me up. I'm trying to picture the architects of
the M1 saying "We can't build a motorway from London to Leeds because
there are 37 railways in the way."

If there was demand for the Northern Line to go to Mill Hill Broadway, a
tunnel would be dug. Single would probably be enough, although you'd
want to redouble the surface part from Finchley Central to Copthall. But
the fact that they've never bothered putting an interchange by Colindeep
Lane where the Edgware branch crosses the Thameslink route makes me
query the business case for a Mill Hill interchange, even if a surface
alignment could be found and the existing bridges were double track.

Incidentally, I just realized how ironic it is that Belsize Park had
deep level shelters constructed beneath the Northern Line platforms,
when they could have dug two platform tunnels on the Thameslink line and
used them as shelters instead. Although, perhaps they wouldn't have been
deep enough for the purpose, and their construction would have probably
required several months of closure of two tracks on interrupted
operation of the Thameslink Line. Having said that, wouldn't
construction of the deep level tubes have caused settlement in the
Northern Line? Were speed restrictions imposed during their construction?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Safeguarding for Crossrail 2 updated Jim Chisholm London Transport 0 March 24th 15 02:37 PM
Updated TfL Real Time Web Page Paul Corfield London Transport 20 May 29th 10 02:11 AM
Oyster travel cap (z2-6 ) if travel is within 2-6 but fare is via Z1(UPDATED !!!) [email protected] London Transport 23 February 16th 09 07:27 PM
Updated (ATOC) Staff Guide to Oyster (long) Barry Salter London Transport 17 November 30th 06 09:41 PM
DLR website updated recently? s c London Transport 14 July 26th 03 09:45 PM


All times are GMT. The time now is 06:07 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017