London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #27   Report Post  
Old March 30th 15, 12:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2009
Posts: 121
Default Updated London Crossrail 2 route protected

On 2015-03-30, Steve Lewis wrote:
What could be done relatively cheaply would be to build a second platform
at Mill Hill East.


A platform may be relatively cheap. Passenger access to it, not so much.
And all you get is that a train can depart as soon as the following
train arrives.

Combined with reversing trains at Finchley Central in the reversing siding
to the south of the station, rather than in a platform as at present,


As soon as you do that you have to path them between High Barnet trains in
both directions, with consequent problems for both services. And you've
just added to the turnaround time at that end. The current shuttle
frequency is 15 minutes, 10 minutes is possible (though not reliably
so) at the moment. I don't think your suggestions could make 10 viable,
let alone doing any better.

you could increase service frequency to Mill Hill East. Or run a Finsbury
Par to Mill Hill East service at a decent frequency.


Finsbury Park? There's an awful lot of missing infrastructure before
that's possible! When through services (to anywhere) run, they take a
path that could otherwise be a High Barnet train, and because of the
conflict at Finchley Central they either risk an extra path loss, or add
a delay which makes any frequency gain impossible.

Eric
--
ms fnd in a lbry
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Safeguarding for Crossrail 2 updated Jim Chisholm London Transport 0 March 24th 15 02:37 PM
Updated TfL Real Time Web Page Paul Corfield London Transport 20 May 29th 10 02:11 AM
Oyster travel cap (z2-6 ) if travel is within 2-6 but fare is via Z1(UPDATED !!!) [email protected] London Transport 23 February 16th 09 07:27 PM
Updated (ATOC) Staff Guide to Oyster (long) Barry Salter London Transport 17 November 30th 06 09:41 PM
DLR website updated recently? s c London Transport 14 July 26th 03 09:45 PM


All times are GMT. The time now is 09:02 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017