On Friday, 15 July 2016 09:45:17 UTC+1, Roland Perry wrote:
Believe me. The delays are almost always owing to passengers ****ing up in one way or another. I'll believe that. I travelled on the Northern Line from Euston to Embankment the other day. And at every single station one passenger or other blocked the doors. Often repeatedly. There were even people left on the platform, who when the doors were opened for a second attempt at closing, leapt aboard only to have their backpacks caught in the doors! And all of this with the dispatcher yelling down the PA for passengers not to obstruct the doors!! That's exactly what I have seen. Amateurs like SpudLikeYou delaying the service for the professional punters. SHAME!! |
#22
![]() |
|||
|
|||
![]() |
#24
![]() |
|||
|
|||
![]()
wrote:
On 15.07.16 10:10, Basil Jet wrote: On 2016\07\15 09:18, d wrote: On Thu, 14 Jul 2016 12:35:13 -0700 (PDT) Offramp wrote: On Thursday, 14 July 2016 09:28:19 UTC+1, wrote: AFAIK its all ATO now, so why are there still 3 min service gaps (at least on the Bank branch) with trains chugging along at what can't be much more than 20mph? Is there a capacity limit with camden town junction or are there simply not enough trains for a victoria line 1 min gap service? Believe me. The delays are almost always owing to passengers ****ing up in one way or another. That may be the case in certain circumstances, but unless northern line passengers are bunch of cretins in comparison to those on the victoria and jubilee I don't see that as a good reason for the poor frequency. Perhaps when (if) the line is finally split when the battersea extension opens it will improve, or at least one half will. On the subject of the extension, anyone know if tunnel boring has started yet? The main tunneling starts in 2017. https://tfl.gov.uk/travel-informatio...line-extension Any idea on when work to rebuild Bank is due to start? Or is it still at a feasibility stage? https://tfl.gov.uk/travel-informatio...k-and-monument |
#25
![]() |
|||
|
|||
![]()
On Sunday, 17 July 2016 14:27:28 UTC+1, wrote:
On 15.07.16 10:10, Basil Jet wrote: On 2016\07\15 09:18, d wrote: On Thu, 14 Jul 2016 12:35:13 -0700 (PDT) Offramp wrote: On Thursday, 14 July 2016 09:28:19 UTC+1, wrote: AFAIK its all ATO now, so why are there still 3 min service gaps (at least on the Bank branch) with trains chugging along at what can't be much more than 20mph? Is there a capacity limit with camden town junction or are there simply not enough trains for a victoria line 1 min gap service? Believe me. The delays are almost always owing to passengers ****ing up in one way or another. That may be the case in certain circumstances, but unless northern line passengers are bunch of cretins in comparison to those on the victoria and jubilee I don't see that as a good reason for the poor frequency. Perhaps when (if) the line is finally split when the battersea extension opens it will improve, or at least one half will. On the subject of the extension, anyone know if tunnel boring has started yet? The main tunneling starts in 2017. https://tfl.gov.uk/travel-informatio...line-extension Any idea on when work to rebuild Bank is due to start? Or is it still at a feasibility stage? It would be so fantastic if Bank was complexity rebuilt. But I don't think I'll ever see it. Never in my lifetime. |
#26
![]() |
|||
|
|||
![]()
On 2016-07-17 15:52:23 +0000, Offramp said:
It would be so fantastic if Bank was complexity rebuilt. But I don't think I'll ever see it. Never in my lifetime. The difficulty is the huge disruption closing it will cause. Neil -- Neil Williams Put my first name before the @ to reply. |
#27
![]() |
|||
|
|||
![]()
On Monday, 18 July 2016 09:01:45 UTC+1, Neil Williams wrote:
On 2016-07-17 15:52:23 +0000, Offramp said: It would be so fantastic if Bank was complexity rebuilt. But I don't think I'll ever see it. Never in my lifetime. The difficulty is the huge disruption closing it will cause. Neil -- Neil Williams Put my first name before the @ to reply. {Apologies for my garbled, auto-corrected comment] It might be possible one August. A whole August with everyone involved. Mind you, I've been at Tottenham Court Road often and there seems to be hundreds of guys in orange strolling around - you never see the same one twice - but the project is still, I believe, over-running on time. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why does the victoria line still have signals? | London Transport | |||
DLR strike off - Tube Lines infraco strike still on, but Tubeservices will still run | London Transport | |||
Still got Jubilee Line stopping at Charing + at Goodge St | London Transport | |||
Why the piccadilly to Heathrow , why not the District? | London Transport | |||
still live possible chat | London Transport |