Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Battersea extension
On Tue, 11 Oct 2016 11:58:36 +0100
Recliner wrote: On Tue, 11 Oct 2016 08:51:59 +0000 (UTC), d wrote: Just curious - does anyone know what form the architecture will take, will it be like the JLE, crossrail or something completely new? Both stations will be under large new buildings, so they may not have much surface presence. I think the inside design will be similar to Crossrail, as that's the current style. The JLE stations were designed 20 years ago. http://www.estatesgazette.com/blogs/...2015/11/nine-e ms-station-towers-planned/ Ah, the Bland Glass Box style. Oh well, so much for innovation. In 40 years time it'll look as dated and unattractive as 60s tower blocks do today. Assuming the glass hasn't all fallen out by then and been replaced by brick. Also I presume the 2 new stations will have platform doors too which I imagine will mean some new kit on the trains - unless its already installed. I don't think there will be PEDs. But why would the trains need extra kit if PEDs are fitted? I just assumed there needs to be some kit in the train to tell the door mechanism that its arrived and fully stopped. I can't see how you'd get the 2nd part of that accurate enough just by using some sort of passive sensor. -- Spud |
#2
|
|||
|
|||
Battersea extension
|
#3
|
|||
|
|||
Battersea extension
On Tue, 11 Oct 2016 14:13:00 +0100
Roland Perry wrote: In message , at 13:02:39 on Tue, 11 Oct 2016, d remarked: I don't think there will be PEDs. But why would the trains need extra kit if PEDs are fitted? I just assumed there needs to be some kit in the train to tell the door mechanism that its arrived and fully stopped. I can't see how you'd get the 2nd part of that accurate enough just by using some sort of passive sensor. If the teething troubles they had with the JLE were correctly reported, most of the PED-synching is down to the driver's skills, rather than technology. Its ATO. However there still needs to be something to tell the platform doors to open when the train doors open and I assume its some bit of NFC kit on the train. -- Spud |
#4
|
|||
|
|||
Battersea extension
|
#5
|
|||
|
|||
Battersea extension
Roland Perry wrote:
In message , at 13:43:15 on Tue, 11 Oct 2016, d remarked: If the teething troubles they had with the JLE were correctly reported, most of the PED-synching is down to the driver's skills, rather than technology. Its ATO. What is, JLE or the Battersea extension? Both now, but not the Jubilee when the JLE with its PEDs first opened. However there still needs to be something to tell the platform doors to open when the train doors open and I assume its some bit of NFC kit on the train. If ATO doesn't know where the train is, just as well as that sort of NFC device, I'm astonished. I think it's the signalling that operates the doors, and of course it knows exactly where the train is. But I'm not sure how it knows to close the PEDs. |
#6
|
|||
|
|||
Battersea extension
On Tue, 11 Oct 2016 14:13:49 -0000 (UTC)
Recliner wrote: Roland Perry wrote: In message , at 13:43:15 on Tue, 11 Oct 2016, d remarked: If the teething troubles they had with the JLE were correctly reported, most of the PED-synching is down to the driver's skills, rather than technology. Its ATO. What is, JLE or the Battersea extension? Both now, but not the Jubilee when the JLE with its PEDs first opened. However there still needs to be something to tell the platform doors to open when the train doors open and I assume its some bit of NFC kit on the train. If ATO doesn't know where the train is, just as well as that sort of NFC device, I'm astonished. I think it's the signalling that operates the doors, and of course it knows exactly where the train is. But I'm not sure how it knows to close the PEDs. Or open them given that its still down to the driver to press the open button AFAIK. I doubt a signal is sent all the way to the main signalling control system then all the way back to the doors to tell them to open because if the train is being driven in emergency manual mode because of an ATO failure then those platform doors won't be opening anytime soon. -- Spud |
#7
|
|||
|
|||
Battersea extension
wrote:
On Tue, 11 Oct 2016 14:13:49 -0000 (UTC) Recliner wrote: Roland Perry wrote: In message , at 13:43:15 on Tue, 11 Oct 2016, d remarked: If the teething troubles they had with the JLE were correctly reported, most of the PED-synching is down to the driver's skills, rather than technology. Its ATO. What is, JLE or the Battersea extension? Both now, but not the Jubilee when the JLE with its PEDs first opened. However there still needs to be something to tell the platform doors to open when the train doors open and I assume its some bit of NFC kit on the train. If ATO doesn't know where the train is, just as well as that sort of NFC device, I'm astonished. I think it's the signalling that operates the doors, and of course it knows exactly where the train is. But I'm not sure how it knows to close the PEDs. Or open them given that its still down to the driver to press the open button AFAIK. I doubt a signal is sent all the way to the main signalling control system then all the way back to the doors to tell them to open because if the train is being driven in emergency manual mode because of an ATO failure then those platform doors won't be opening anytime soon. Presumably the signalling system knows the train has stopped in the right place to open the doors. Perhaps the on-board ATO also tells the signalling system if the doors are open/closed, while the signalling controls whether the doors can open? There's presumably a manual override for emergencies. |
#8
|
|||
|
|||
Battersea extension
wrote:
On Tue, 11 Oct 2016 14:13:00 +0100 Roland Perry wrote: In message , at 13:02:39 on Tue, 11 Oct 2016, d remarked: I don't think there will be PEDs. But why would the trains need extra kit if PEDs are fitted? I just assumed there needs to be some kit in the train to tell the door mechanism that its arrived and fully stopped. I can't see how you'd get the 2nd part of that accurate enough just by using some sort of passive sensor. If the teething troubles they had with the JLE were correctly reported, most of the PED-synching is down to the driver's skills, rather than technology. Its ATO. However there still needs to be something to tell the platform doors to open when the train doors open and I assume its some bit of NFC kit on the train. The Jubilee is ATO now, but wasn't when the JLE opened. I think the PEDs are operated by the signalling system. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Battersea extension | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Battersea extension up in smoke? | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport |